Brussels connection

the best address for international procurement

Dva tendry na AV hardware (monitory, obří displeje) pro Vídeň. Nabídněte

·

,

Dva tendry pro UNIDO (United Nations Industrial Development Organization, Vídeň):

1) Delivery and installation of a Professional Signage Monitor at the entrance of Building C of the Vienna International Centre

Deadline for quotation 25/7

Popis: Professional Signage Monitor LCD/LED: 84 inch, black or dark grey thin frame, 16:9, native resolution UHD 3840×2160 pixels, designed for min. 16 hours/5 days a week use, Display Port Input, HDMI Input, programmable operating hours (time/days), automatic signal recognition in combination with automatic ON/OFF, VESA standard mountable, IR remote control, size approx. 195cm x 114cm (see Annex01); non-reflective robust surface for integration into glas wall; anti-burn-in mechanism;

Brightness: 700 nits. Lifetime/Lifecycle: 10 years at a duty cycle of 16h/5 days a week. Viewing angle: ≥50% of on-axis within 160 degree of horizontal viewing angle; ≥50% of on-axis within 120 degree of vertical viewing angle. Operating temperature: 0 – 40°C. Colour temperature: min. 3,500 – 9.000 K, adjustable. Contrast ratio, static: ≥ 2,500:1

2) Implementation of Large Format Displays (LFDs) at the Rotunda in the Vienna International Centre

General Outline:  In view of the above interested companies are requested to provide a fix and firm offer for a relevant solution, i.e. 3 pieces of Large Format Displays (LFDs) including the therefore needed implementation, maintenance and on-call repair services consisting of, but not limited to:  LFD Element implementation  Displays/Panels (flat on curved surface)  Video processing hard and software  Mounting Hardware for flat display elements or modules on curved surface/wall  Planning Construction and Installation engineering (planning documents) including but not limited to documents and drawings of:  Mounting positions  Mounting constructions  All mounting information needed for structural engineer  Documentation for all installed units, control units etc.  Wiring diagrams and wiring runs  Required electrical power including Voltage, Current, Power calculations (peak and average program/content) as well as interface description (type of power outlets, location etc.); electrical power and related installations will be provided by BMS  Network and other infrastructure requirements (outlets, location etc.); network and related installations will be provided by BMS  Service laptop with all administration and configuration software, test pattern software needed for onsite testing etc.  Documentation  Technical documentation (mechanical, electrical, electronic and optical parts, data- and other interfaces)  Maintenance instructions/documentation  Technician training (system design, configuration, troubleshooting etc.)  Spare parts  Suggested onsite spare modules/units/parts for fast replacement of defective items  Maintenance and on call support (service level agreement)  Inspection/Performance check Update and Calibration  Cleaning  Updates of hardware, firmware and software  Maintenance protocol

Detailed LFD Specifications: The LFDs are intended for reproducing banners and other video content delivered as video information of the connected sources (i. e. Player PC of Digital Signage System). The LFD shall be using SMD-LED-technology build out of smaller modules (tiles) with no gaps or visible bezels between the modules. The modules of the LFDs shall be mounted on the Rotunda’s surface (curved mounting) with a radius of approximately 16 meters. Each of the 3 LFDs shall have the following properties:

The size of the active display area shall be:  vertical: 1.50m – 1.70m  horizontal: 8.00m – 9.50m

The maximum size of the display including necessary mounting hardware like frames etc: shall be:  height (vertical): 1.90m  length (horizontal): 9.70m  depth : 0.30 m

Refer to attached sketch (TOR Annex 1 sketch) as example for information only; final dimensions to be planned by the contractor within the above specifications. The aspect ratio of one entire active display shall be 48:9 (3 x 16:9 side by side) with the following physical resolutions:  vertical: 720 pixel (minimum, real pixels)  horizontal: 3 x 1,280 (minimum, real pixels) = 3,840 pixel (minimum)

The brightness of the LFD shall be:  calibrated for initial approval: ≥ 1.000 nits  operating brightness planned(*1): ≥ 700 nits (automatically calibrated and regulated, including logging of brightness or LFD drive level is mandatory) over a life-cycle of 10 years at a duty cycle of 16h/5 days a week  brightness uniformity(*1): min 90% for 10 years of service at a duty cycle of 16h/5 days a week at planned operating brightness of 700 nits  colour uniformity (grayscale)(*1): min 80% for 10 years of service, at a duty cycle of 16h/5 days a week, at planned operating brightness of 700 nits  ≥50% of on-axis within 160 degree of horizontal viewing angle  ≥50% of on-axis within 120 degree of vertical viewing angle

The colour properties of the LFD shall be:  colour temperature: 3,500 – 9,000 K, adjustable  colour and brightness calibration: automatically  colour depth: min 8 bit per colour (RGB)  colour gamut: ≥90% sRGB

Additional properties of the LFD shall be:  automatic ON/OFF dependent on signal precence on input  remote ON/OFF via control software/hardware interface  programmable ON/OFF with schedule (incl. definition of special holidays) etc. also in definable combination with the above  maximum pixel failure(*1): ≤ 4 per screen  minimum initial contrast ratio, static ≥ 2,500:1  frame rate ≥ 60 fps (whole screen)  refresh rate ≥ 1,000 Hz  glare & haze ≤ 2%  anti-burn-in mechanism  maximum electrical power consumption ≤ 1kW per m² at full brightness  maximum weight ≤ 180 kg/ per m length including complete substructure for mounting  fanless design or noise ≤ 46 dB(A) SPL (measured directly underneath LFD at 1.5m above floor level of Rotunda)  operating temperature range: 0 – 40 degree Celsius  IP Rating: ≥ IP20

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Get updates

From art exploration to the latest archeological findings, all here in our weekly newsletter.

Subscribe